The Lakeshore Road Emergency Road Reconstruction and Shoreline Stabilization Project includes 4 Phases:
A degraded 120m section of Lakeshore Road was widened, realigned, and reconstructed. An armourstone retaining wall and guiderail system was installed to improve the structure and safety of the road along the lake shore.
A 100m section of new guiderail was installed along the north side of Lakeshore Rd, immediately west of the intersection of Lakeshore Rd & Windsor Dr to improve road safety at an existing sloped area.
As part of the 2021 Road Repair & Rehabilitation program, the eastern portion of Lakeshore Road was repaired, repaved, and painted. Work included improvements to the intersection of Windsor Drive and Lakeshore Road. The remaining length of Lakeshore Road will be repaired, in phases, during future repair & rehab program delivery.
A design to improve the drainage channel between Lakeshore Road and Windsor Drive is underway. Work is anticipated to include improvements to the culverts at both the Windsor Drive and Lakeshore Road end of the channel, as well as regrading and reinforcement of the channel bed. Construction to proceed pending budget approval.
Project Manager
Town of Stouffville
Phone: 905-640-1910 ext. 4241
curtis.roach@townofws.ca
Lakeshore Road Reconstruction and Shoreline Stabilization has finished this stage.
Lakeshore Road Reconstruction and Shoreline Stabilization has finished this stage.
Lakeshore Road Reconstruction and Shoreline Stabilization has finished this stage – Completed in 2021.
111 Sandiford Drive, Stouffville ON, CA
customer.service@townofws.ca
(905) 640-1900
Accessible formats available upon request. Contact 905-640-1900 or customer.service@townofws.ca for assistance.
© 2024 Town of Whitchurch-Stouffville | Privacy and Disclaimer